Date range control

Hi, today  Viewer see the date range control in report change Advanced date ranges and waste time to choose date. Before, in the report, date range control showed the calendar  which viewer can choose date. How to fix it, please?

BIMERAP_0-1728378222798.png

 

6 4 268