Formatting a Progress Type Column

I have a table which correctly displays 1 progress column type at 3/4. But if I try to apply this format rule:

OR([Cable1Progress]=“Quarter”,[Cable1Progress]=“Half”,[Cable1Progress]=“Three Quarter”)

Then the table view the colour is correct, but now it shows a whole ball i.e. equivalent to 100%

Also in the detail view the detail view that Progress column shows 2 images. A small Full circle and a larger 3/4 circle. See image below, the WMC1 column at the top is [Cable1Progress]. The bottom WMC1 column is the Progress column

Anyone have any ideas whats going on?

Solved Solved
0 5 2,579
1 ACCEPTED SOLUTION

Steve
Platinum 4
Platinum 4

I’d call this a bug.

View solution in original post

5 REPLIES 5
Top Labels in this Space