New"ish" user here,,, I'm creating a quote ...

New"ish" user here, I’m creating a quote tracker based on an existing spreadsheet, (in use since long before I joined the firm), we have 6 categories of products, with 3 columns for each, Out for Quote, Scheduled for Quote, and Quote ready to send.

Out for Quote and Ready to send are both Yes or No, Scheduled is a date. Depending on the job, anywhere from 1 to all 6 categories are being utilized, so rather than having each of those always being shown with all 3 stages, is there a way to only have all 3 show only if it’s parent is checked as yes for being quoted?

Thank you in advance,

DA

0 1 298
1 REPLY 1
Top Labels in this Space